SINeutron
Industries · Manufacturing

Every shift on target. Every step the same right way.

From the owner's monthly target to the operator's work instruction, SINeutron connects the plant into one system people use every day.

Command centreWhole company · This monthSample data
78Think
64Build
71Evolve
Orbit score 71 · weakest orbit: Build. Two seats without a daily report this week. Next step: assign owners for Stores and Dispatch reviews.
Seats and KPIs

What each seat reports, every day.

Typical seats in a plant and the KPIs they own. Your own seats and targets are set up with you.

Plant Head

  • Output vs plan
  • On-time delivery
  • Orbit score
  • Customer complaints

Production Supervisor

  • Output vs plan
  • Rejection %
  • Downtime minutes
  • Changeover time

Quality Engineer

  • First-pass yield
  • Complaints closed
  • Audit findings closed
  • Inspection on time

Maintenance Lead

  • Breakdown hours
  • PM done on time
  • Mean time to repair
  • Spares ready

Stores In-charge

  • Stock accuracy
  • Receipts booked within 24 h
  • Material issued on time
  • Slow-moving items

Dispatch Lead

  • On-time dispatch
  • Documents error-free
  • Packing checks done
  • Pending orders
A shift in SINeutron

From the morning huddle to the last dispatch.

  1. 0108:45
  2. 0210:00
  3. 0314:30
  4. 0417:30
  5. 05Month end

Shift huddle

Yesterday's output, rejections and breakdowns on one screen; three priorities for the shift.

Work instructions at the machine

The operator opens the SOP in Hindi by scanning the machine; set-up checks are ticked on the phone.

A breakdown, logged properly

Maintenance owns the fix; downtime is counted automatically against the seat's KPI.

Daily reports

Every seat reports in two minutes. Off-target numbers turn amber or red.

The plant scorecard

The owner sees every plant's numbers and Orbit score without anyone compiling a report.

Morning huddlePlant 1 · 08:45Sample data
YesterdayOutput 104% · Rejection 1.2% · 1 breakdown (52 min)
Today's 3Line 2 die change · Coil from stores by 11:00 · Audit prep
BlockersCoil delay: Stores to confirm by 10:30
ActionsMaintenance PM on M-7 · owner: Maintenance Lead · today
10 min · notes saved
Work instructionMachine M-7 · operator viewSample data
ENहिंदी
1मशीन चालू करने से पहले सभी गार्ड जाँचें।
2डाई को सही टॉर्क से कसें।
35 पीस ट्रायल चलाएँ।
4पहला पीस QC से पास कराएँ।
Team reportsPlant 1 · TodaySample data
4of 5 seats reported
Production SupervisorReported 17:41
Quality EngineerReported 17:55
Dispatch LeadReported late 19:10
Stores In-chargeNot reported · reminder sent
Maintenance LeadReported 18:02
Daily reportProduction Supervisor · TodaySample data
KPITargetActual
Output pcs12,000ok
Rejection %≤ 1.5ok
Downtime min≤ 45warn
On-time dispatch %98ok
Win New die set-up cut change-over to 18 min.
Blocker Coil delay on line 2, raised with stores.
Submitted in 1 min 52 s
ScorecardWeeks 1–4Sample data
Output vs planOn target
Rejection %On target
DowntimeWatch
Daily reports filedOn target
A starting SOP library

Typical SOPs we load for a plant.

  • SOP-PRD-001Machine set-up and first-off approval
  • SOP-PRD-002Shift handover
  • SOP-QA-001Incoming inspection
  • SOP-QA-002First piece and patrol inspection
  • SOP-QA-003Non-conformance handling
  • SOP-MNT-001Daily machine checks
  • SOP-MNT-002Preventive maintenance
  • SOP-STR-001Material receipt and storage
  • SOP-STR-002Material issue to production
  • SOP-DSP-001Packing and dispatch checks
  • SOP-SAF-001Machine guarding and lock-out
  • SOP-HR-001Operator induction

Examples. Your own SOPs are loaded during configuration.

Manufacturing questions

What plant owners ask us.

Do operators need a computer?

No. Operators use a shared or personal phone to read SOPs and tick checks. Supervisors fill daily reports on the phone in about two minutes.

Can SOPs be in Hindi?

Yes. SISOP translates work instructions into simple Hindi for operators, with the English master kept under revision control.

Will it replace our ERP?

No. Your ERP keeps orders, stock and accounts. SINeutron runs goals, teams and SOPs beside it.

We have several plants. Does that work?

Yes. Each plant has its own seats and scorecard, and the owner sees all plants together.

Ready to run like a world-class company?

See SINeutron with your own goals, seats and processes in a 30-minute demo, or ask for a proposal tailored to your company.